Help needed to survive Government Maladministration
0% complete
$480 raised of $100K AUD
6 donations
We are a couple and small business owners whose lives have been devastated by a failed building project in 2020, Government Maladministration (deliberate wrongdoing!) at the VBA/BPC, exploitation by the Victorian Government, and years of ongoing proceedings at VCAT over more than 5 years.
As a consequence, we have sustained severe psychiatric injuries and catastrophic financial damages of more than $960,000.
We should have moved into a compliant home during November 2020. Instead, every day of our lives is filled with severe stress and anxiety, and we lost 8 precious people (family and friends) in our lives.
All donations will help with urgent living costs, medical and psychological support, housing stability, medical reports, etc., while we are still trying to resolve the matter.
For more than 6 years, we have been paying interest on a construction loan for a dwelling that can never be lived in due to the non-compliant building work. This alone has already added up to more than $90,000 since 2020.
In late 2019, we engaged a builder to construct our dream home. Construction commenced in March 2020 but was never completed. Subsequent independent expert investigations identified extensive non-compliant construction and plumbing work. The consequences have been devastating.
Most building practitioners failed to provide compliant building work, incl. plumbers. Despite non-compliance, they issued compliance certificates to the VBA/BPC.
What is wrong with these people?
In summary:
- Slab approximately 500 mm (50 cm) too low and almost 350 mm below ground level.
- Non-compliant foundation, which results in slab movement.
- Non-compliant wall framing, which results in a sagging roof and cracks to the interior and exterior.
- Non-functional stormwater system, caused by the slab being 0.5 m too low, with water overflowing at the gutters.
- Non-functional sewer plumbing (for the septic tank) with backflow to the house, caused by the slab being 0.5 m too low.
- Non-compliant box gutters - overflowing and missing sump.
- Non-compliant verandah footings and structure.
- Second-hand roof tiles with flaking and discoloured surface.
- Non-compliant internal plumbing.
- And many more defects
The lender valued the house (twice) at $0.
Demolition will be the only way to ensure full compliance with the Building Code of Australia (BCA).
What about the Victorian Government?
During June/July 2020, we asked for help from the responsible building practitioner. The building practitioner acknowledged various issues, but these were never resolved.
In mid-August 2020, the building practitioner referred the matter to the Victorian Building Authority (VBA) and closed his own case. The VBA never took action either.
During August 2020, we asked the VBA for help. The VBA refused a site visit. A document and photos that evidence the non-compliant building work were provided in October 2020. The VBA closed the complaint again in early December 2020. The relevant Minister failed to step in.
Upon request, the VBA visited the site in April 2021 and identified various plumbing issues, including defects related to the slab being 0.5m too low and the non-functional stormwater system.
Nobody took action to address the matters.
After further complaints, the VBA conducted an 8-month investigation from July 2021 until March 2022. In May 2022, the VBA concluded again that the responsible building practitioner had not committed any breaches and closed the case.
The VBA mentioned ongoing investigations into another building practitioner and the builder, but never took any action.
Another 2 years later, in June 2024, VBA CEO, Anna Cronin, requested an independent investigation into the matter.
New investigation reports in August 2024 confirmed that the building work for ALL mandatory inspection stages was non-compliant. The reports also confirmed that all responsible building practitioners had committed severe breaches.
How could the VBA have denied the breaches for 4 years?
The director for Compliance and Enforcement deliberately shielded all building practitioners by not taking any action and telling us lies.
Even the 2024 VBA reports were materially manipulated to protect the responsible building practitioner.
This is called Government Maladministration.
The VBA CEO confirmed in a letter in July 2024 the severe harm caused: “This issue has been ongoing for around four years and has been the cause of very significant mental health and financial impact…” and “…it has become apparent to me that a contributing factor to their ongoing mental stress has been the extensive correspondence required with various Government agencies”.
The VBA's failures were documented in the published report "Victorian Building Authority – The Case for Transformation". Our story was one of the case studies in that report. The report was used to announce the VBA’s "rebranding" to the Building and Plumbing Commission (BPC).
We were left without compensation, protection, or any practical pathway to recovery, despite the Government's admissions of wrongdoing that caused the severe injuries.
We feel exploited by a system that acknowledges its own regulatory failures, as exposed by the Weir report, yet leaves us to carry the devastating financial, emotional and personal consequences, without accountability, meaningful assistance or redress.
What happened to the building practitioners?
The BPC issued “Disciplinary Actions” in late 2025, more than 14 months after the August 2024 VBA Investigation reports. All building practitioners appealed these Disciplinary Actions. The disciplinary actions are therefore “stayed” while the appeals are on foot. In other words, there have been no practical consequences, and it remains “business as usual”.
The BPC and the other parties also objected to our request to be heard at VCAT as a severely affected party (witness). This means the severely affected homeowners may remain unheard.
Does this sound right?
Did the members of parliament provide any support?
The following members of parliament were contacted but did NOT offer any support:
- Marlo Baragwanath (Ombudsman)
- Nick Staikos (Minister for Housing, Victoria)
- Sonya Kilkenny (Minister for Planning, Victoria)
- Jaclyn Symes (Treasurer, Victoria)
- Jacinta Allan (Former Premier of Victoria)
- Paul Edbrooke (Minister for Consumer Affairs, Victoria)
- Catherine King (local member)
- Juliana Addison (local member)
- Michaela Settle (local member)
- Martha Haylett(local member)
- Jacinta Ermacora (local member)
Why did elected representatives not intervene in a case that involved documented regulatory failure and severe personal injuries?
Why is there still no resolution after more than 5 years?
From December 2020 onwards, the VBA and ministers "advised" us to resolve the building dispute at VCAT. A VCAT application was filed in October 2021.
VCAT's own guidelines state that domestic building disputes generally resolve within about 2 years.
So why, after more than 5 years, is there still no end in sight?
The answer is sad and simple: "unhelpful" lawyers, broken VCAT processes, and abuse of process by the other parties. For example, the builder filed his defence 2 years and 9 months late. The “expert” report also contained false and misleading information.
Why did VCAT accept the late filing?
Nobody intervened.
In 2024, the respondents filed cost applications against us, which were unsuccessful but delayed the VCAT matter by more than 9 months and resulted in additional costs.
Nobody intervened.
In 2025, the respondents joined other parties, without merit. This again delayed the VCAT matter by more than 9 months and resulted in additional costs.
Nobody intervened.
In December 2025, the mediation at VCAT failed as the respondents had no desire to resolve the dispute and offered a small fraction as compensation for the actual damage caused.
The pattern shows deliberate delay tactics to avoid a decision on the core defects for years, escalate costs, and further harm to us.
The real-life impact on us
Had our home been properly constructed and completed in accordance with the building requirements, we should have moved in during November 2020 and lived our lives in peace.
Since then we have lost 8 precious people (family and friends) in our lives.
The defective construction, prolonged regulatory failures and years of unresolved proceedings have robbed us of irreplaceable time with loved ones, financial security and the simple joy of being together.
To us, this loss of time, safety, health, and dignity is unforgivable.
Our health has been severely affected. The stress and trauma have been and continue to be overwhelming.
Help is needed.
What did the Victoria Ombudsman say?
Complaints during 2022 and 2023 were closed. We were referred back to the VBA.
Yes, you read correctly.
In 2026, a meeting request was accepted. During this meeting, we provided evidence of the VBA wrongdoing and described the real-life consequences.
This is what a Senior Manager at the Ombudsman, Michael Heffernan, wrote in his letter: “…we cannot identify any further steps we can take that will provide a meaningful outcome for you. As a result, we will not be taking any further action in respect of your concerns about VBA".
After a review, the Ombudsman's office declined to take further action on the basis that the VBA no longer existed, notwithstanding that the complaint concerned the VBA’s historical conduct and regulatory failures.
What is wrong with these people?
It is time to hold the Victorian Government accountable for the harm they caused to innocent people, like us.
Please share this page to spread the word to provide help.
Thank you.