We wanted to thank everyone who has donated so far. BFD #2 realizes we have a large overall goal, so with that in mind we would like to raise another $1700 dollars by the end of 2018! The money can be donated through GoFundMe or make checks payable to:
Barnet Fire District #2
Barnet Village Water System
PO Box 77
Barnet, VT
05821
Don't forget to follow our FaceBook page BFD #2 - Barnet Village Water .
According to the IRS, donations to Federal, state, and local governments, if your contribution is solely for public purpose are tax-deductible and we are currently working on a letter of determination from them. Receipts can be sent through GoFundMe or mail.
As before, the estimated total cost in line replacement, construction, and infrastructure improvements is $250,000. The work will be done by certified water supply operators, engineers, and contractors.
PHASE 1: Anderson Street and Mill Hill replace 1000 feet of degraded 2” buried copper water line costing approximately $100,000.
PHASE 2: Church Street Bypass reroutes the failing water line below the Stevens River across the Church Street Bridge where a specialized installation is needed due to environmental conditions costing $150,000.
These are the facts and your contribution is greatly appreciated.
Barnet Fire District #2
Barnet Village Water System
PO Box 77
Barnet, VT
05821
Don't forget to follow our FaceBook page BFD #2 - Barnet Village Water .
According to the IRS, donations to Federal, state, and local governments, if your contribution is solely for public purpose are tax-deductible and we are currently working on a letter of determination from them. Receipts can be sent through GoFundMe or mail.
As before, the estimated total cost in line replacement, construction, and infrastructure improvements is $250,000. The work will be done by certified water supply operators, engineers, and contractors.
PHASE 1: Anderson Street and Mill Hill replace 1000 feet of degraded 2” buried copper water line costing approximately $100,000.
PHASE 2: Church Street Bypass reroutes the failing water line below the Stevens River across the Church Street Bridge where a specialized installation is needed due to environmental conditions costing $150,000.